WSUD · STORMWATER MANAGEMENT

Water Sensitive Urban Design (WSUD) & STORM Reports in Melbourne.

Council-ready stormwater quality assessments, Melbourne Water STORM ratings, and practical rainwater harvesting strategies supporting town planning permit approvals across Melbourne and Victoria.

Send Site & Roof Plans
Clause 53.18 Compliance

Practical WSUD solutions that achieve a 100% STORM rating.

Under Clause 53.18 of the Victorian Planning Provisions, residential subdivisions, multi-unit dwellings, and commercial developments must demonstrate best-practice stormwater management.

01 · STORMWATER MODELLING

Melbourne Water STORM & WSUD Reports

Complete site catchment breakdown and pollutant reduction calculations formatted for rapid council engineering sign-off.

  • Melbourne Water STORM calculator modelling (100%+ score)
  • Impervious roof, driveway, and paving catchment schedules
  • Clause 53.18 stormwater quality compliance response
  • Maintenance schedules for ongoing system upkeep
02 · TREATMENT DESIGN

Site-Specific Treatment Strategies

Cost-effective stormwater treatment options sized to fit tight townhouse and commercial footprints without wasting yard space.

  • Rainwater tanks connected to toilet flushing & laundry
  • Raingardens and vegetated bioretention planters
  • Permeable paving and infiltration trenches
  • Proprietary gross pollutant traps & filter cartridges
Planning Approvals

Clear, actionable WSUD documentation.

Councils frequently issue RFIs when roof areas, tank volumes, or overflow connections are unclear on planning drawings. Our WSUD reports include a clear site catchment plan and exact specifications for your draftsperson to add to the plans.

We service projects across Wyndham, Melton, Brimbank, Hobsons Bay, Greater Geelong, and all Melbourne metropolitan councils.

Catchment Area Breakdown Detailed measurement of roof areas, impervious driveways/paths, and pervious landscaping.
Rainwater Tank Sizing Optimised tank volumes connected to internal reuse to maximize STORM points and minimize cost.
Site Treatment Layout Clear schematic showing catchment flow paths, tank locations, and raingarden dimensions.
Maintenance Program Simple inspection and maintenance checklist required by council planning conditions.
Workflow

From site plan to council-compliant WSUD report.

Fast turnaround so your planning permit application stays on schedule.

01

Send Site & Roof Plans

Email your site plan, roof plan, floor plans, and any council stormwater RFI notes.

02

Receive Fixed Quote

We review site impervious areas and provide a fixed quotation within 1 business day.

03

STORM Assessment

We calculate catchments and size tanks or raingardens to exceed the 100% STORM benchmark.

04

WSUD Report Delivery

Receive your full WSUD Report, STORM certificate, and plan markup notes for council submission.

FAQ

Frequently asked questions about WSUD Reports.

When is a WSUD Report required in Melbourne?

A WSUD Report is commonly required for dual occupancies, multi-unit townhouse developments, subdivisions, and commercial or industrial planning permit applications under Clause 53.18.

What is a Melbourne Water STORM rating?

STORM is an online stormwater assessment tool used by Victorian councils to verify that stormwater runoff achieves best-practice pollutant reductions (45% Total Nitrogen reduction, represented by a STORM score of 100% or higher).

Do I need both an SDA and a WSUD Report?

If your project requires a Sustainable Design Assessment (SDA), stormwater management is included inside the SDA. For smaller projects (like a 2-dwelling dual occupancy) where council only requests stormwater treatment, a standalone WSUD Report is all you need.

Get Started

Need a WSUD Report for your planning permit?

Send us your site and roof plans today for a fast, fixed-fee quote.

Request Your Free Quote